Punjab govt. spent 7 billion dollars in Lahore's development projects in last 7 years :- Fawad Chaud

Pak1stani

Prime Minister (20k+ posts)
few millions on breaking walnuts

maxresdefault.jpg
 

Raaz

(50k+ posts) بابائے فورم
جتنے پیسے زرداری اور نواز حکومت نے قرض لیا ہے اور خرچ کئے ہیں اتنے میں سارا پاکستان امریکہ کے سٹنڈرڈ کا بن سکتا ہے
 

arafay

Chief Minister (5k+ posts)
7 billion!!! i guarantee you if pakistan spent 7 billion on karachi we would have given back at least 7 billion in tax revenue every year for next decade.
 

musakhan786

Senator (1k+ posts)
Punjab mein yeh do bhaio nay andhere nagri chauput raj lagaya hua hai;but the question is who will do the accountability, our courts, establishment, the bias media answer is big no than who will do anybody know the answer
 

AakhirKab

MPA (400+ posts)
First he said 7 billion dollars and then 7 billion rupees?? I am sure he wanted to say 7 billion rupees in 7 years which comes out to be 1 billion rupees per year.

And some of our friends here claim Pakistan could have been almost like US if this much money (1 billion rupees per year) was spent on Pakistan? Chornay ki bhi had hoti hai yaar!!!
 

AakhirKab

MPA (400+ posts)
I just counted a couple of finished projects and they worth almost a billion rupees. Looking at the amount of work, 1 billion rupees per year does not sound unrealistic!!

When a 200 sq yard house in decent neighborhood is selling for over 10 million rupees, these projects don't appear terribly expensive!!

1 crore = 10 million

50 crore = 500 million

100 crore = 1 billion

Infrastructure Projects (Year 2007-08 to 2012-2013)

Railway Over Bridges (ROBs/RUBs)

[TABLE="class: tableData, width: 100%"]
[TR="class: evenRow"]
[TD="class: firstTd"]ROBs/RUBs completed 32[/TD]
[TD="width: 140, align: right"]Rs. 540 Cr.[/TD]
[/TR]
[TR="class: lastTr"]
[TD="class: firstTd"]ROBS/RUBs ongoing 6[/TD]
[TD="align: right"]Rs. 65 Cr.[/TD]
[/TR]
[/TABLE]
High Level Bridges

[TABLE="class: tableData, width: 100%"]
[TR="class: evenRow"]
[TH="class: firstTh lastTh, colspan: 2"](A) Completed[/TH]
[/TR]
[TR]
[TD="class: firstTd"]HLB Sutlej River Sarai Ka Pattan[/TD]
[TD="width: 140, align: right"]Rs. 55 Cr.[/TD]
[/TR]
[TR="class: evenRow"]
[TD="class: firstTd"]Submersible Bridge Bhangi Choe Hoshiarpur[/TD]
[TD="align: right"]Rs. 6 Cr.[/TD]
[/TR]
[TR]
[TD="class: firstTd"]HLB Makhu[/TD]
[TD="align: right"]Rs. 60 Cr.[/TD]
[/TR]
[TR="class: evenRow"]
[TD="class: firstTd"]Multilane Bridge over UBDC Amritsar[/TD]
[TD="align: right"]Rs. 26 Cr.[/TD]
[/TR]
[TR]
[TD="class: firstTd"]HLB on Samana Guhla Road[/TD]
[TD="align: right"]Rs. 4 Cr.[/TD]
[/TR]
[TR="class: evenRow"]
[TD="class: firstTd"]HLB over Muradpur drain Tarn Taran[/TD]
[TD="align: right"]Rs. 6 Cr.[/TD]
[/TR]
[TR]
[TH="class: firstTh lastTh, colspan: 2"](B) In progress[/TH]
[/TR]
[TR="class: evenRow"]
[TD="class: firstTd"]HLB Sirhind Canal (Ropar Byepass)[/TD]
[TD="align: right"]Rs. 12 Cr.[/TD]
[/TR]
[TR]
[TD="class: firstTd"]HLB Sutlej River (Ropar Byepass)[/TD]
[TD="align: right"]Rs. 80 Cr.[/TD]
[/TR]
[TR="class: evenRow"]
[TD="class: firstTd"]HLB Sutlej River at Mattewara[/TD]
[TD="align: right"]Rs. 63 Cr.[/TD]
[/TR]
[TR]
[TD="class: firstTd"]HLB Beas River at Dhanoya Pattan[/TD]
[TD="align: right"]Rs. 63 Cr.[/TD]
[/TR]
[TR="class: lastTr evenRow"]
[TD="class: firstTd"]HLB Chakki River (Mirthal)[/TD]
[TD="align: right"]Rs. 62 Cr.[/TD]
[/TR]
[/TABLE]
Upgrdation of Road Projects (EPC MODE)

[TABLE="class: tableData, width: 100%"]
[TR="class: evenRow"]
[TH="class: firstTh lastTh, colspan: 2"](A) Completed[/TH]
[/TR]
[TR]
[TD="class: firstTd"]Length 50km[/TD]
[TD="width: 140, align: right"]Rs. 125 Cr.[/TD]
[/TR]
[TR="class: evenRow"]
[TH="class: firstTh lastTh, colspan: 2"](B) In progress[/TH]
[/TR]
[TR="class: lastTr"]
[TD="class: firstTd"]Length 80 km[/TD]
[TD="align: right"]Rs. 287 Cr.[/TD]
[/TR]
[/TABLE]
Upgrdation of Road Projects (PPP MODE)

[TABLE="class: tableData, width: 100%"]
[TR="class: evenRow"]
[TH="class: firstTh lastTh, colspan: 2"](A) Completed[/TH]
[/TR]
[TR]
[TD="class: firstTd"]Length 520 km[/TD]
[TD="width: 140, align: right"]Rs. 624 Cr.[/TD]
[/TR]
[TR="class: evenRow"]
[TH="class: firstTh lastTh, colspan: 2"](B) In progress[/TH]
[/TR]
[TR="class: lastTr"]
[TD="class: firstTd"]Length 150 km[/TD]
[TD="align: right"]Rs. 28 Cr.[/TD]
[/TR]
[/TABLE]
Work under PSRSP (Project) from 2007-08 to 2012-13

Periodic Maintenance

[TABLE="class: tableData, width: 100%"]
[TR="class: evenRow"]
[TD="class: firstTd"]Ajnala-Ramdass Road
Chheharta Dhand Bir Road[/TD]
[TD="width: 140, align: right"]Rs. 5.40 Crore[/TD]
[/TR]
[TR]
[TD="class: firstTd"]Gurdaspur Sri Hargobindpur Road[/TD]
[TD="align: right"]Rs. 10.10 Crore[/TD]
[/TR]
[TR="class: evenRow"]
[TD="class: firstTd"]Sunam-Longowal-Badwar Road (PM-3-A)
Pakhokey-Tappa Road (PM-3-B)[/TD]
[TD="align: right"]Rs. 6.40 Crore[/TD]
[/TR]
[TR]
[TD="class: firstTd"]Khanna-Samrala-Nawashahar-Garshankar Road (PM-4)[/TD]
[TD="align: right"]Rs. 12.90 Crore[/TD]
[/TR]
[TR="class: evenRow"]
[TD="class: firstTd"]Kapurthala-Tashpur-Sultanpur-Dalla Road (PM-5)[/TD]
[TD="align: right"]Rs. 4.90 Crore[/TD]
[/TR]
[TR]
[TD="class: firstTd"]Abohar-Sitoguna-Dabwali Road[/TD]
[TD="align: right"]Rs. 3.50 Crore[/TD]
[/TR]
[TR="class: evenRow"]
[TD="class: firstTd"]Faridkot-Ferozpur Road (PM-7)[/TD]
[TD="align: right"]Rs. 4.40 Crore[/TD]
[/TR]
[TR]
[TD="class: firstTd"]Bagha Purana-Bhagta Bhucho road[/TD]
[TD="align: right"]Rs. 7.50 Crore[/TD]
[/TR]
[TR="class: lastTr evenRow"]
[TD="class: firstTd"]Sri Hargobindpur-Batala-Dera-Baba Nanak Road[/TD]
[TD="align: right"]Rs. 8.20 Crore[/TD]
[/TR]
[/TABLE]
Rehabiltation Road

[TABLE="class: tableData, width: 100%"]
[TR="class: evenRow"]
[TD="class: firstTd"]Zira-Ferozpur (RH-!)[/TD]
[TD="width: 140, align: right"]Rs. 45.60 Crore[/TD]
[/TR]
[TR]
[TD="class: firstTd"]Chandigarh-Landran-Chunni-Sirhind Road (RH-2)[/TD]
[TD="align: right"]Rs. 39.50 Crore[/TD]
[/TR]
[TR="class: evenRow"]
[TD="class: firstTd"]Phillaur-Nagur Aur Rahon Road (RH-3)[/TD]
[TD="align: right"]Rs. 58.50 Crore[/TD]
[/TR]
[TR]
[TD="class: firstTd"]Kapurthala-Tarn Taran Road (RH-4)[/TD]
[TD="align: right"]Rs. 56.50 Crore[/TD]
[/TR]
[TR="class: evenRow"]
[TD="class: firstTd"]Dharamkot-Zira Road (Rh-5)[/TD]
[TD="align: right"]Rs. 37.60 Crore[/TD]
[/TR]
[TR="class: lastTr"]
[TD="class: firstTd"]Patiala Sirhind Road (RH-6)[/TD]
[TD="align: right"]Rs. 28.10 Crore[/TD]
[/TR]
[/TABLE]
Upgradation Road

[TABLE="class: tableData, width: 100%"]
[TR="class: evenRow"]
[TD="class: firstTd"]Kharar- Banur-Tepla Road (UG-1)[/TD]
[TD="width: 140, align: right"]Rs. 108.00 Crore[/TD]
[/TR]
[TR]
[TD="class: firstTd"]Ludhiana-Malerkotla-Sangrur Road (UG-2)[/TD]
[TD="align: right"]Rs. 226.00 Crore[/TD]
[/TR]
[TR="class: evenRow"]
[TD="class: firstTd"]Tarn-Taran Chabhal-Attari Road (UG-3)[/TD]
[TD="align: right"]Rs. 45.90 Crore[/TD]
[/TR]
[TR="class: lastTr"]
[TD="class: firstTd"]Road Safety Enhancement work[/TD]
[TD="align: right"]Rs. 9.96 Crore[/TD]
[/TR]
[/TABLE]
PMGSY Scheme

Works completed during the year 2007-2008 to 2012-2013[TABLE="class: tableData, width: 100%"]
[TR="class: lastTr evenRow"]
[TD="class: firstTd"]Upgradation of Village roads.[/TD]
[TD="width: 100"]KM-3314.46[/TD]
[TD="width: 140, align: right"]Rs.1354.29 Crore[/TD]
[/TR]
[/TABLE]
National Highway Upgradation to Four Laning

Completed Works From Year 2007-2008 to 2012-2013[TABLE="class: tableData, width: 100%"]
[TR="class: evenRow"]
[TH="class: firstTh lastTh, colspan: 3, align: left"]Maintenance and Upgradation[/TH]
[/TR]
[TR]
[TD="class: firstTd"]For regular maintenance and up gradation of National Highways[/TD]
[TD][/TD]
[TD="width: 140, align: right"]Rs.872 Crores[/TD]
[/TR]
[TR="class: evenRow"]
[TD="class: firstTd"]Jalandhar-Amritsar-Wagha Border (NH-1)
Mukerian-Pathankot (NH-1A)
Kurali-Kiratpur Sahib (NH-21)
Ambala-Zirakpur (NH-22)[/TD]
[TD="width: 100"]KM 204[/TD]
[TD="width: 140, align: right"]Rs. 1376 Crore[/TD]
[/TR]
[TR]
[TH="class: firstTh lastTh, colspan: 3, align: left"]In progress 4/6 Laning[/TH]
[/TR]
[TR="class: evenRow"]
[TD="class: firstTd"]6-laning Shambhu-Jalandhar (NH-1)
4-laning Bhogpur-Mukerian (NH-1A)
Pathankot-Amritsar (NH-15)
Ludhiana-Talwandi (NH-95)[/TD]
[TD]KM 400[/TD]
[TD="align: right"]Rs.3284 Crore[/TD]
[/TR]
[TR]
[TH="class: firstTh lastTh, colspan: 3, align: left"]Work Alloted - 4 Laning[/TH]
[/TR]
[TR="class: evenRow"]
[TD="class: firstTd"]Zirakpur-Patiala-Bathinda (NH-64)[/TD]
[TD]KM 219[/TD]
[TD="align: right"]Rs. 2500 Crores[/TD]
[/TR]
[TR]
[TH="class: firstTh lastTh, colspan: 3, align: left"]CRF Scheme - Completed Works[/TH]
[/TR]
[TR="class: lastTr evenRow"]
[TD="class: firstTd"]Up gradation of State Roads (SH & MDR)[/TD]
[TD]KM - 442[/TD]
[TD="align: right"]Rs.370 Crores[/TD]
[/TR]
[/TABLE]
Link Roads (2007-2008 to 2012-2013)

[TABLE="class: tableData, width: 100%"]
[TR="class: evenRow"]
[TD="class: firstTd"]New Construction[/TD]
[TD="width: 100"]KM-3739[/TD]
[TD="width: 140, align: right"]Rs. 436 Crore[/TD]
[/TR]
[TR="class: lastTr"]
[TD="class: firstTd"]Repair[/TD]
[TD]KM -9954[/TD]
[TD="align: right"]Rs. 768 Crore[/TD]
[/TR]
[/TABLE]
Plan Roads (2007-2008 to 2012-2013)

[TABLE="class: tableData, width: 100%"]
[TR="class: evenRow"]
[TD="class: firstTd"]Repair of Plan Road[/TD]
[TD="width: 100"]KM -2687[/TD]
[TD="width: 140, align: right"]Rs. 980 Crore[/TD]
[/TR]
[TR="class: lastTr"]
[TD="class: firstTd"]Up gradation of rural roads & 71 Nos. of Bridges Up gradation
(Under Nabard Scheme)[/TD]
[TD]KM -2553[/TD]
[TD="align: right"]Rs. 1303 Crore[/TD]
[/TR]
[/TABLE]
Buildings- Maintenance and Repair

[TABLE="class: tableData, width: 100%"]
[TR="class: lastTr evenRow"]
[TD="class: firstTd"]Judicial court complexes, Modern jails, Colleges, Schools, Offices, Hospitals, Residences, Memorials and Academies[/TD]
[TD="width: 140, align: right"]Rs. 2300 Crore[/TD]
[/TR]
[/TABLE]

http://www.nripunjab.gov.in/achive-publicworks.htm
 

arafay

Chief Minister (5k+ posts)
I just counted a couple of finished projects and they worth almost a billion rupees. Looking at the amount of work, 1 billion rupees per year does not sound unrealistic!!

When a 200 sq yard house in decent neighborhood is selling for over 10 million rupees, these projects don't appear terribly expensive!!

Infrastructure Projects (Year 2007-08 to 2012-2013)

Railway Over Bridges (ROBs/RUBs)

[TABLE="class: tableData, width: 100%"]
[TR="class: evenRow"]
[TD="class: firstTd"]ROBs/RUBs completed – 32[/TD]
[TD="width: 140, align: right"]Rs. 540 Cr.[/TD]
[/TR]
[TR="class: lastTr"]
[TD="class: firstTd"]ROBS/RUBs ongoing – 6[/TD]
[TD="align: right"]Rs. 65 Cr.[/TD]
[/TR]
[/TABLE]
High Level Bridges

[TABLE="class: tableData, width: 100%"]
[TR="class: evenRow"]
[TH="class: firstTh lastTh, colspan: 2"](A) Completed[/TH]
[/TR]
[TR]
[TD="class: firstTd"]HLB Sutlej River Sarai Ka Pattan[/TD]
[TD="width: 140, align: right"]Rs. 55 Cr.[/TD]
[/TR]
[TR="class: evenRow"]
[TD="class: firstTd"]Submersible Bridge Bhangi Choe Hoshiarpur[/TD]
[TD="align: right"]Rs. 6 Cr.[/TD]
[/TR]
[TR]
[TD="class: firstTd"]HLB Makhu[/TD]
[TD="align: right"]Rs. 60 Cr.[/TD]
[/TR]
[TR="class: evenRow"]
[TD="class: firstTd"]Multilane Bridge over UBDC Amritsar[/TD]
[TD="align: right"]Rs. 26 Cr.[/TD]
[/TR]
[TR]
[TD="class: firstTd"]HLB on Samana Guhla Road[/TD]
[TD="align: right"]Rs. 4 Cr.[/TD]
[/TR]
[TR="class: evenRow"]
[TD="class: firstTd"]HLB over Muradpur drain Tarn Taran[/TD]
[TD="align: right"]Rs. 6 Cr.[/TD]
[/TR]
[TR]
[TH="class: firstTh lastTh, colspan: 2"](B) In progress[/TH]
[/TR]
[TR="class: evenRow"]
[TD="class: firstTd"]HLB Sirhind Canal (Ropar Byepass)[/TD]
[TD="align: right"]Rs. 12 Cr.[/TD]
[/TR]
[TR]
[TD="class: firstTd"]HLB Sutlej River (Ropar Byepass)[/TD]
[TD="align: right"]Rs. 80 Cr.[/TD]
[/TR]
[TR="class: evenRow"]
[TD="class: firstTd"]HLB Sutlej River at Mattewara[/TD]
[TD="align: right"]Rs. 63 Cr.[/TD]
[/TR]
[TR]
[TD="class: firstTd"]HLB Beas River at Dhanoya Pattan[/TD]
[TD="align: right"]Rs. 63 Cr.[/TD]
[/TR]
[TR="class: lastTr evenRow"]
[TD="class: firstTd"]HLB Chakki River (Mirthal)[/TD]
[TD="align: right"]Rs. 62 Cr.[/TD]
[/TR]
[/TABLE]
Upgrdation of Road Projects (EPC MODE)

[TABLE="class: tableData, width: 100%"]
[TR="class: evenRow"]
[TH="class: firstTh lastTh, colspan: 2"](A) Completed[/TH]
[/TR]
[TR]
[TD="class: firstTd"]Length 50km[/TD]
[TD="width: 140, align: right"]Rs. 125 Cr.[/TD]
[/TR]
[TR="class: evenRow"]
[TH="class: firstTh lastTh, colspan: 2"](B) In progress[/TH]
[/TR]
[TR="class: lastTr"]
[TD="class: firstTd"]Length 80 km[/TD]
[TD="align: right"]Rs. 287 Cr.[/TD]
[/TR]
[/TABLE]
Upgrdation of Road Projects (PPP MODE)

[TABLE="class: tableData, width: 100%"]
[TR="class: evenRow"]
[TH="class: firstTh lastTh, colspan: 2"](A) Completed[/TH]
[/TR]
[TR]
[TD="class: firstTd"]Length 520 km[/TD]
[TD="width: 140, align: right"]Rs. 624 Cr.[/TD]
[/TR]
[TR="class: evenRow"]
[TH="class: firstTh lastTh, colspan: 2"](B) In progress[/TH]
[/TR]
[TR="class: lastTr"]
[TD="class: firstTd"]Length 150 km[/TD]
[TD="align: right"]Rs. 28 Cr.[/TD]
[/TR]
[/TABLE]
Work under PSRSP (Project) from 2007-08 to 2012-13

Periodic Maintenance

[TABLE="class: tableData, width: 100%"]
[TR="class: evenRow"]
[TD="class: firstTd"]Ajnala-Ramdass Road
Chheharta Dhand Bir Road[/TD]
[TD="width: 140, align: right"]Rs. 5.40 Crore[/TD]
[/TR]
[TR]
[TD="class: firstTd"]Gurdaspur Sri Hargobindpur Road[/TD]
[TD="align: right"]Rs. 10.10 Crore[/TD]
[/TR]
[TR="class: evenRow"]
[TD="class: firstTd"]Sunam-Longowal-Badwar Road (PM-3-A)
Pakhokey-Tappa Road (PM-3-B)[/TD]
[TD="align: right"]Rs. 6.40 Crore[/TD]
[/TR]
[TR]
[TD="class: firstTd"]Khanna-Samrala-Nawashahar-Garshankar Road (PM-4)[/TD]
[TD="align: right"]Rs. 12.90 Crore[/TD]
[/TR]
[TR="class: evenRow"]
[TD="class: firstTd"]Kapurthala-Tashpur-Sultanpur-Dalla Road (PM-5)[/TD]
[TD="align: right"]Rs. 4.90 Crore[/TD]
[/TR]
[TR]
[TD="class: firstTd"]Abohar-Sitoguna-Dabwali Road[/TD]
[TD="align: right"]Rs. 3.50 Crore[/TD]
[/TR]
[TR="class: evenRow"]
[TD="class: firstTd"]Faridkot-Ferozpur Road (PM-7)[/TD]
[TD="align: right"]Rs. 4.40 Crore[/TD]
[/TR]
[TR]
[TD="class: firstTd"]Bagha Purana-Bhagta Bhucho road[/TD]
[TD="align: right"]Rs. 7.50 Crore[/TD]
[/TR]
[TR="class: lastTr evenRow"]
[TD="class: firstTd"]Sri Hargobindpur-Batala-Dera-Baba Nanak Road[/TD]
[TD="align: right"]Rs. 8.20 Crore[/TD]
[/TR]
[/TABLE]
Rehabiltation Road

[TABLE="class: tableData, width: 100%"]
[TR="class: evenRow"]
[TD="class: firstTd"]Zira-Ferozpur (RH-!)[/TD]
[TD="width: 140, align: right"]Rs. 45.60 Crore[/TD]
[/TR]
[TR]
[TD="class: firstTd"]Chandigarh-Landran-Chunni-Sirhind Road (RH-2)[/TD]
[TD="align: right"]Rs. 39.50 Crore[/TD]
[/TR]
[TR="class: evenRow"]
[TD="class: firstTd"]Phillaur-Nagur Aur Rahon Road (RH-3)[/TD]
[TD="align: right"]Rs. 58.50 Crore[/TD]
[/TR]
[TR]
[TD="class: firstTd"]Kapurthala-Tarn Taran Road (RH-4)[/TD]
[TD="align: right"]Rs. 56.50 Crore[/TD]
[/TR]
[TR="class: evenRow"]
[TD="class: firstTd"]Dharamkot-Zira Road (Rh-5)[/TD]
[TD="align: right"]Rs. 37.60 Crore[/TD]
[/TR]
[TR="class: lastTr"]
[TD="class: firstTd"]Patiala –Sirhind Road (RH-6)[/TD]
[TD="align: right"]Rs. 28.10 Crore[/TD]
[/TR]
[/TABLE]
Upgradation Road

[TABLE="class: tableData, width: 100%"]
[TR="class: evenRow"]
[TD="class: firstTd"]Kharar- Banur-Tepla Road (UG-1)[/TD]
[TD="width: 140, align: right"]Rs. 108.00 Crore[/TD]
[/TR]
[TR]
[TD="class: firstTd"]Ludhiana-Malerkotla-Sangrur Road (UG-2)[/TD]
[TD="align: right"]Rs. 226.00 Crore[/TD]
[/TR]
[TR="class: evenRow"]
[TD="class: firstTd"]Tarn-Taran Chabhal-Attari Road (UG-3)[/TD]
[TD="align: right"]Rs. 45.90 Crore[/TD]
[/TR]
[TR="class: lastTr"]
[TD="class: firstTd"]Road Safety Enhancement work[/TD]
[TD="align: right"]Rs. 9.96 Crore[/TD]
[/TR]
[/TABLE]
PMGSY Scheme

Works completed during the year 2007-2008 to 2012-2013[TABLE="class: tableData, width: 100%"]
[TR="class: lastTr evenRow"]
[TD="class: firstTd"]Upgradation of Village roads.[/TD]
[TD="width: 100"]KM-3314.46[/TD]
[TD="width: 140, align: right"]Rs.1354.29 Crore[/TD]
[/TR]
[/TABLE]
National Highway Upgradation to Four Laning

Completed Works From Year 2007-2008 to 2012-2013[TABLE="class: tableData, width: 100%"]
[TR="class: evenRow"]
[TH="class: firstTh lastTh, colspan: 3, align: left"]Maintenance and Upgradation[/TH]
[/TR]
[TR]
[TD="class: firstTd"]For regular maintenance and up gradation of National Highways[/TD]
[TD][/TD]
[TD="width: 140, align: right"]Rs.872 Crores[/TD]
[/TR]
[TR="class: evenRow"]
[TD="class: firstTd"]Jalandhar-Amritsar-Wagha Border (NH-1)
Mukerian-Pathankot (NH-1A)
Kurali-Kiratpur Sahib (NH-21)
Ambala-Zirakpur (NH-22)[/TD]
[TD="width: 100"]KM – 204[/TD]
[TD="width: 140, align: right"]Rs. 1376 Crore[/TD]
[/TR]
[TR]
[TH="class: firstTh lastTh, colspan: 3, align: left"]In progress 4/6 Laning[/TH]
[/TR]
[TR="class: evenRow"]
[TD="class: firstTd"]6-laning Shambhu-Jalandhar (NH-1)
4-laning Bhogpur-Mukerian (NH-1A)
Pathankot-Amritsar (NH-15)
Ludhiana-Talwandi (NH-95)[/TD]
[TD]KM – 400[/TD]
[TD="align: right"]Rs.3284 Crore[/TD]
[/TR]
[TR]
[TH="class: firstTh lastTh, colspan: 3, align: left"]Work Alloted - 4 Laning[/TH]
[/TR]
[TR="class: evenRow"]
[TD="class: firstTd"]Zirakpur-Patiala-Bathinda (NH-64)[/TD]
[TD]KM – 219[/TD]
[TD="align: right"]Rs. 2500 Crores[/TD]
[/TR]
[TR]
[TH="class: firstTh lastTh, colspan: 3, align: left"]CRF Scheme - Completed Works[/TH]
[/TR]
[TR="class: lastTr evenRow"]
[TD="class: firstTd"]Up gradation of State Roads (SH & MDR)[/TD]
[TD]KM - 442[/TD]
[TD="align: right"]Rs.370 Crores[/TD]
[/TR]
[/TABLE]
Link Roads (2007-2008 to 2012-2013)

[TABLE="class: tableData, width: 100%"]
[TR="class: evenRow"]
[TD="class: firstTd"]New Construction[/TD]
[TD="width: 100"]KM-3739[/TD]
[TD="width: 140, align: right"]Rs. 436 Crore[/TD]
[/TR]
[TR="class: lastTr"]
[TD="class: firstTd"]Repair[/TD]
[TD]KM -9954[/TD]
[TD="align: right"]Rs. 768 Crore[/TD]
[/TR]
[/TABLE]
Plan Roads (2007-2008 to 2012-2013)

[TABLE="class: tableData, width: 100%"]
[TR="class: evenRow"]
[TD="class: firstTd"]Repair of Plan Road[/TD]
[TD="width: 100"]KM -2687[/TD]
[TD="width: 140, align: right"]Rs. 980 Crore[/TD]
[/TR]
[TR="class: lastTr"]
[TD="class: firstTd"]Up gradation of rural roads & 71 Nos. of Bridges Up gradation
(Under Nabard Scheme)[/TD]
[TD]KM -2553[/TD]
[TD="align: right"]Rs. 1303 Crore[/TD]
[/TR]
[/TABLE]
Buildings- Maintenance and Repair

[TABLE="class: tableData, width: 100%"]
[TR="class: lastTr evenRow"]
[TD="class: firstTd"]Judicial court complexes, Modern jails, Colleges, Schools, Offices, Hospitals, Residences, Memorials and Academies[/TD]
[TD="width: 140, align: right"]Rs. 2300 Crore[/TD]
[/TR]
[/TABLE]

http://www.nripunjab.gov.in/achive-publicworks.htm

just metro bus project with all its flyer overs is around 70 billion rs or 0.7 billion usd. this doesnt include the subside of 2 billion per year to sustain this project. without the subsidy, hardly anyone would ride this bus. the unfortunate part is the subsidy comes from the pockets of all punjab tax payers (via nfc award) including those who may never visit lahore in their lifetime.
 

AakhirKab

MPA (400+ posts)
just metro bus project with all its flyer overs is around 70 billion rs or 0.7 billion usd. this doesnt include the subside of 2 billion per year to sustain this project. without the subsidy, hardly anyone would ride this bus. the unfortunate part is the subsidy comes from the pockets of all punjab tax payers (via nfc award) including those who may never visit lahore in their lifetime.

Well, supporting public projects by state/federal government is nothing new as long as they benefit general public.

As far as tax money goes, NFC Awards money is based on a province population so Punjab is getting it's fair share. This is their money based upon a formula that was agreed upon by all provinces/parties.

https://www.fra.dot.gov/Page/P0249
 

arafay

Chief Minister (5k+ posts)
Well, supporting public projects by state/federal government is nothing new as long as they benefit general public.

As far as tax money goes, NFC Awards money is based on a province population so Punjab is getting it's fair share. This is their money based upon a formula that was agreed upon by all provinces/parties.

https://www.fra.dot.gov/Page/P0249

the point is lahore bus is for residents of Lahore. All projects catering lahore only should come from the revenue generated from lahore only. why should a citizen of okara pay for a service used in lahore only.

when this kind of unfair distribution happens, you get national parties like mqm. Their argument is very strong - karachi contributes over 65% of all FBR revenue and around 45% of total GDP. yet the total development budget of karachi is not even 10% of GDP.
 

AakhirKab

MPA (400+ posts)
the point is lahore bus is for residents of Lahore. All projects catering lahore only should come from the revenue generated from lahore only. why should a citizen of okara pay for a service used in lahore only.

when this kind of unfair distribution happens, you get national parties like mqm. Their argument is very strong - karachi contributes over 65% of all FBR revenue and around 45% of total GDP. yet the total development budget of karachi is not even 10% of GDP.

I tend to agree!
 

Aslan

Chief Minister (5k+ posts)
Sharif brothers are spending all the budget of Punjab on Lahore.People of south Punjab ,Bhawalpur , Seraiki region and Pothwar region must demand their own provinces.Sharifs have no interest to develope these areas.
 

Yasir1983

MPA (400+ posts)
I just counted a couple of finished projects and they worth almost a billion rupees. Looking at the amount of work, 1 billion rupees per year does not sound unrealistic!!

When a 200 sq yard house in decent neighborhood is selling for over 10 million rupees, these projects don't appear terribly expensive!!

1 crore = 10 million

50 crore = 500 million

100 crore = 1 billion

Infrastructure Projects (Year 2007-08 to 2012-2013)

Railway Over Bridges (ROBs/RUBs)

[TABLE="class: tableData, width: 100%"]
[TR="class: evenRow"]
[TD="class: firstTd"]ROBs/RUBs completed – 32[/TD]
[TD="width: 140, align: right"]Rs. 540 Cr.[/TD]
[/TR]
[TR="class: lastTr"]
[TD="class: firstTd"]ROBS/RUBs ongoing – 6[/TD]
[TD="align: right"]Rs. 65 Cr.[/TD]
[/TR]
[/TABLE]
High Level Bridges

[TABLE="class: tableData, width: 100%"]
[TR="class: evenRow"]
[TH="class: firstTh lastTh, colspan: 2"](A) Completed[/TH]
[/TR]
[TR]
[TD="class: firstTd"]HLB Sutlej River Sarai Ka Pattan[/TD]
[TD="width: 140, align: right"]Rs. 55 Cr.[/TD]
[/TR]
[TR="class: evenRow"]
[TD="class: firstTd"]Submersible Bridge Bhangi Choe Hoshiarpur[/TD]
[TD="align: right"]Rs. 6 Cr.[/TD]
[/TR]
[TR]
[TD="class: firstTd"]HLB Makhu[/TD]
[TD="align: right"]Rs. 60 Cr.[/TD]
[/TR]
[TR="class: evenRow"]
[TD="class: firstTd"]Multilane Bridge over UBDC Amritsar[/TD]
[TD="align: right"]Rs. 26 Cr.[/TD]
[/TR]
[TR]
[TD="class: firstTd"]HLB on Samana Guhla Road[/TD]
[TD="align: right"]Rs. 4 Cr.[/TD]
[/TR]
[TR="class: evenRow"]
[TD="class: firstTd"]HLB over Muradpur drain Tarn Taran[/TD]
[TD="align: right"]Rs. 6 Cr.[/TD]
[/TR]
[TR]
[TH="class: firstTh lastTh, colspan: 2"](B) In progress[/TH]
[/TR]
[TR="class: evenRow"]
[TD="class: firstTd"]HLB Sirhind Canal (Ropar Byepass)[/TD]
[TD="align: right"]Rs. 12 Cr.[/TD]
[/TR]
[TR]
[TD="class: firstTd"]HLB Sutlej River (Ropar Byepass)[/TD]
[TD="align: right"]Rs. 80 Cr.[/TD]
[/TR]
[TR="class: evenRow"]
[TD="class: firstTd"]HLB Sutlej River at Mattewara[/TD]
[TD="align: right"]Rs. 63 Cr.[/TD]
[/TR]
[TR]
[TD="class: firstTd"]HLB Beas River at Dhanoya Pattan[/TD]
[TD="align: right"]Rs. 63 Cr.[/TD]
[/TR]
[TR="class: lastTr evenRow"]
[TD="class: firstTd"]HLB Chakki River (Mirthal)[/TD]
[TD="align: right"]Rs. 62 Cr.[/TD]
[/TR]
[/TABLE]
Upgrdation of Road Projects (EPC MODE)

[TABLE="class: tableData, width: 100%"]
[TR="class: evenRow"]
[TH="class: firstTh lastTh, colspan: 2"](A) Completed[/TH]
[/TR]
[TR]
[TD="class: firstTd"]Length 50km[/TD]
[TD="width: 140, align: right"]Rs. 125 Cr.[/TD]
[/TR]
[TR="class: evenRow"]
[TH="class: firstTh lastTh, colspan: 2"](B) In progress[/TH]
[/TR]
[TR="class: lastTr"]
[TD="class: firstTd"]Length 80 km[/TD]
[TD="align: right"]Rs. 287 Cr.[/TD]
[/TR]
[/TABLE]
Upgrdation of Road Projects (PPP MODE)

[TABLE="class: tableData, width: 100%"]
[TR="class: evenRow"]
[TH="class: firstTh lastTh, colspan: 2"](A) Completed[/TH]
[/TR]
[TR]
[TD="class: firstTd"]Length 520 km[/TD]
[TD="width: 140, align: right"]Rs. 624 Cr.[/TD]
[/TR]
[TR="class: evenRow"]
[TH="class: firstTh lastTh, colspan: 2"](B) In progress[/TH]
[/TR]
[TR="class: lastTr"]
[TD="class: firstTd"]Length 150 km[/TD]
[TD="align: right"]Rs. 28 Cr.[/TD]
[/TR]
[/TABLE]
Work under PSRSP (Project) from 2007-08 to 2012-13

Periodic Maintenance

[TABLE="class: tableData, width: 100%"]
[TR="class: evenRow"]
[TD="class: firstTd"]Ajnala-Ramdass Road
Chheharta Dhand Bir Road[/TD]
[TD="width: 140, align: right"]Rs. 5.40 Crore[/TD]
[/TR]
[TR]
[TD="class: firstTd"]Gurdaspur Sri Hargobindpur Road[/TD]
[TD="align: right"]Rs. 10.10 Crore[/TD]
[/TR]
[TR="class: evenRow"]
[TD="class: firstTd"]Sunam-Longowal-Badwar Road (PM-3-A)
Pakhokey-Tappa Road (PM-3-B)[/TD]
[TD="align: right"]Rs. 6.40 Crore[/TD]
[/TR]
[TR]
[TD="class: firstTd"]Khanna-Samrala-Nawashahar-Garshankar Road (PM-4)[/TD]
[TD="align: right"]Rs. 12.90 Crore[/TD]
[/TR]
[TR="class: evenRow"]
[TD="class: firstTd"]Kapurthala-Tashpur-Sultanpur-Dalla Road (PM-5)[/TD]
[TD="align: right"]Rs. 4.90 Crore[/TD]
[/TR]
[TR]
[TD="class: firstTd"]Abohar-Sitoguna-Dabwali Road[/TD]
[TD="align: right"]Rs. 3.50 Crore[/TD]
[/TR]
[TR="class: evenRow"]
[TD="class: firstTd"]Faridkot-Ferozpur Road (PM-7)[/TD]
[TD="align: right"]Rs. 4.40 Crore[/TD]
[/TR]
[TR]
[TD="class: firstTd"]Bagha Purana-Bhagta Bhucho road[/TD]
[TD="align: right"]Rs. 7.50 Crore[/TD]
[/TR]
[TR="class: lastTr evenRow"]
[TD="class: firstTd"]Sri Hargobindpur-Batala-Dera-Baba Nanak Road[/TD]
[TD="align: right"]Rs. 8.20 Crore[/TD]
[/TR]
[/TABLE]
Rehabiltation Road

[TABLE="class: tableData, width: 100%"]
[TR="class: evenRow"]
[TD="class: firstTd"]Zira-Ferozpur (RH-!)[/TD]
[TD="width: 140, align: right"]Rs. 45.60 Crore[/TD]
[/TR]
[TR]
[TD="class: firstTd"]Chandigarh-Landran-Chunni-Sirhind Road (RH-2)[/TD]
[TD="align: right"]Rs. 39.50 Crore[/TD]
[/TR]
[TR="class: evenRow"]
[TD="class: firstTd"]Phillaur-Nagur Aur Rahon Road (RH-3)[/TD]
[TD="align: right"]Rs. 58.50 Crore[/TD]
[/TR]
[TR]
[TD="class: firstTd"]Kapurthala-Tarn Taran Road (RH-4)[/TD]
[TD="align: right"]Rs. 56.50 Crore[/TD]
[/TR]
[TR="class: evenRow"]
[TD="class: firstTd"]Dharamkot-Zira Road (Rh-5)[/TD]
[TD="align: right"]Rs. 37.60 Crore[/TD]
[/TR]
[TR="class: lastTr"]
[TD="class: firstTd"]Patiala –Sirhind Road (RH-6)[/TD]
[TD="align: right"]Rs. 28.10 Crore[/TD]
[/TR]
[/TABLE]
Upgradation Road

[TABLE="class: tableData, width: 100%"]
[TR="class: evenRow"]
[TD="class: firstTd"]Kharar- Banur-Tepla Road (UG-1)[/TD]
[TD="width: 140, align: right"]Rs. 108.00 Crore[/TD]
[/TR]
[TR]
[TD="class: firstTd"]Ludhiana-Malerkotla-Sangrur Road (UG-2)[/TD]
[TD="align: right"]Rs. 226.00 Crore[/TD]
[/TR]
[TR="class: evenRow"]
[TD="class: firstTd"]Tarn-Taran Chabhal-Attari Road (UG-3)[/TD]
[TD="align: right"]Rs. 45.90 Crore[/TD]
[/TR]
[TR="class: lastTr"]
[TD="class: firstTd"]Road Safety Enhancement work[/TD]
[TD="align: right"]Rs. 9.96 Crore[/TD]
[/TR]
[/TABLE]
PMGSY Scheme

Works completed during the year 2007-2008 to 2012-2013[TABLE="class: tableData, width: 100%"]
[TR="class: lastTr evenRow"]
[TD="class: firstTd"]Upgradation of Village roads.[/TD]
[TD="width: 100"]KM-3314.46[/TD]
[TD="width: 140, align: right"]Rs.1354.29 Crore[/TD]
[/TR]
[/TABLE]
National Highway Upgradation to Four Laning

Completed Works From Year 2007-2008 to 2012-2013[TABLE="class: tableData, width: 100%"]
[TR="class: evenRow"]
[TH="class: firstTh lastTh, colspan: 3, align: left"]Maintenance and Upgradation[/TH]
[/TR]
[TR]
[TD="class: firstTd"]For regular maintenance and up gradation of National Highways[/TD]
[TD][/TD]
[TD="width: 140, align: right"]Rs.872 Crores[/TD]
[/TR]
[TR="class: evenRow"]
[TD="class: firstTd"]Jalandhar-Amritsar-Wagha Border (NH-1)
Mukerian-Pathankot (NH-1A)
Kurali-Kiratpur Sahib (NH-21)
Ambala-Zirakpur (NH-22)[/TD]
[TD="width: 100"]KM – 204[/TD]
[TD="width: 140, align: right"]Rs. 1376 Crore[/TD]
[/TR]
[TR]
[TH="class: firstTh lastTh, colspan: 3, align: left"]In progress 4/6 Laning[/TH]
[/TR]
[TR="class: evenRow"]
[TD="class: firstTd"]6-laning Shambhu-Jalandhar (NH-1)
4-laning Bhogpur-Mukerian (NH-1A)
Pathankot-Amritsar (NH-15)
Ludhiana-Talwandi (NH-95)[/TD]
[TD]KM – 400[/TD]
[TD="align: right"]Rs.3284 Crore[/TD]
[/TR]
[TR]
[TH="class: firstTh lastTh, colspan: 3, align: left"]Work Alloted - 4 Laning[/TH]
[/TR]
[TR="class: evenRow"]
[TD="class: firstTd"]Zirakpur-Patiala-Bathinda (NH-64)[/TD]
[TD]KM – 219[/TD]
[TD="align: right"]Rs. 2500 Crores[/TD]
[/TR]
[TR]
[TH="class: firstTh lastTh, colspan: 3, align: left"]CRF Scheme - Completed Works[/TH]
[/TR]
[TR="class: lastTr evenRow"]
[TD="class: firstTd"]Up gradation of State Roads (SH & MDR)[/TD]
[TD]KM - 442[/TD]
[TD="align: right"]Rs.370 Crores[/TD]
[/TR]
[/TABLE]
Link Roads (2007-2008 to 2012-2013)

[TABLE="class: tableData, width: 100%"]
[TR="class: evenRow"]
[TD="class: firstTd"]New Construction[/TD]
[TD="width: 100"]KM-3739[/TD]
[TD="width: 140, align: right"]Rs. 436 Crore[/TD]
[/TR]
[TR="class: lastTr"]
[TD="class: firstTd"]Repair[/TD]
[TD]KM -9954[/TD]
[TD="align: right"]Rs. 768 Crore[/TD]
[/TR]
[/TABLE]
Plan Roads (2007-2008 to 2012-2013)

[TABLE="class: tableData, width: 100%"]
[TR="class: evenRow"]
[TD="class: firstTd"]Repair of Plan Road[/TD]
[TD="width: 100"]KM -2687[/TD]
[TD="width: 140, align: right"]Rs. 980 Crore[/TD]
[/TR]
[TR="class: lastTr"]
[TD="class: firstTd"]Up gradation of rural roads & 71 Nos. of Bridges Up gradation
(Under Nabard Scheme)[/TD]
[TD]KM -2553[/TD]
[TD="align: right"]Rs. 1303 Crore[/TD]
[/TR]
[/TABLE]
Buildings- Maintenance and Repair

[TABLE="class: tableData, width: 100%"]
[TR="class: lastTr evenRow"]
[TD="class: firstTd"]Judicial court complexes, Modern jails, Colleges, Schools, Offices, Hospitals, Residences, Memorials and Academies[/TD]
[TD="width: 140, align: right"]Rs. 2300 Crore[/TD]
[/TR]
[/TABLE]

http://www.nripunjab.gov.in/achive-publicworks.htm

These figures are of Indian Punjab not Pakistani Punjab.
 