Mohmand Dam, Drone Shots, September 2020

Digital_Pakistani

Chief Minister (5k+ posts)


The construction work on multipurpose Mohmand Dam Hydropower Project had been carrying out day and night. The project is moving ahead with a good pace and WAPDA is confident to complete the project during high flow season in 2025 as per the timelines. Mohmand Dam Hydropower Project is the 5th highest concrete-face-rock-fill Dam (CFRD) in the world. The temporary access roads to inlet and outlet portals for construction of diversion tunnels had been completed while excavation for inlet and outlet structures was under process. The contractor has started construction of access to query area for preparation of dam fill material. Topographic survey above water level has been completed and hydrographic survey was in progress, while re-regulation pond excavation works were underway. The benefits of the project, the Chairman said that Mohmand Dam Hydropower Project was historic and unique in nature being constructed after the delay of over five decades. The project is scheduled to be completed in five years and eight months. It will store about 1.2 million acre feet (MAF) of water, generate 800 megawatt (MW), contribute 2.86 billion units of low-cost hydel electricity annually to the national grid and help mitigate floods in Peshawar, Charsadda and Naushera. Besides supplementing 160,000 acres of existing land, about 16,700 acres of new land will also be irrigated because of Mohmand Dam. In addition, 300 million gallons water per day will also be provided to Peshawar for drinking purpose. Annual benefits of the project have been estimated at Rs 51.6 billion.
 

nawaz.sharif

Minister (2k+ posts)
Thank you Mr. Nawaz Sharif

Prime Minister Nawaz Sharif on Monday approved, in principle, the financing plan for the Diamer-Bhasha dam and ordered the secretary of water and power to start physical work on the dam before the end of 2017.


May 30th, 2018

Even Faisal Vawda, water minister admitting that all contracts for the dam were awarded in 2017 by Nawaz Sharif (listen from 1:10 onwards)

 
Last edited:

Citizen X

President (40k+ posts)
Thank you Mr. Nawaz Sharif

Prime Minister Nawaz Sharif on Monday approved, in principle, the financing plan for the Diamer-Bhasha dam and ordered the secretary of water and power to start physical work on the dam before the end of 2017.


May 30th, 2018
? ? ? ? ? ? Tuu beech mein apna luch tal ley!
 

chandaa

Prime Minister (20k+ posts)
Thank you Mr. Nawaz Sharif

Prime Minister Nawaz Sharif on Monday approved, in principle, the financing plan for the Diamer-Bhasha dam and ordered the secretary of water and power to start physical work on the dam before the end of 2017.


May 30th, 2018
Thank you Daku Sharif for delaying and blocking all strategic projects ?

Bhasha Dam delayed till 2037
 

Citizen X

President (40k+ posts)
tu sharo ker do aap log.. who is stopping you??
Beghairti ki koi hudd nahi hai tum logon mein. Apni loot maar per sharminda hone ke bajaye ultha dheet ban jate ho.

FYI Work on Bhasha Dam has already started, then there also you will lick your masters balls and post Thank you Khota Sharif because that is all what you lot are good for.

 

nawaz.sharif

Minister (2k+ posts)
Few months back patwaris were all mocking the dam fund ...... Now that the construction on dam has started , they want to take credit for it ...... Bufoons .....
Yeah dam fund is still a joke.. this consutruxtion is not starting from donation collected from dam fund.

Even faisal wavda adimtted on live tv that al paperwork and contracts of this dam was granted by Nawaz League in 2017

 

Hate_Nooras

Chief Minister (5k+ posts)
Thank you Mr. Nawaz Sharif

Prime Minister Nawaz Sharif on Monday approved, in principle, the financing plan for the Diamer-Bhasha dam and ordered the secretary of water and power to start physical work on the dam before the end of 2017.


May 30th, 2018

Even Faisal Vawda, water minister admitting that all contracts for the dam were awarded in 2017 by Nawaz Sharif

Just coming up with ideas and then doing nothing doesn't need a thanks, it needs a slap.
 

Nice2MU

President (40k+ posts)
tu sharo ker do aap log.. who is stopping you??

شروع ہو چکا ہے۔ اگر گنجے غیر ضروری اورنج ٹرین کو سی پیک میں ڈال سکتی تھی تو بھاشا ڈیم کو کیوں نہیں جیسے اس حکومت نے ڈال دیا؟

گنجے اور زرداری صرف کرپٹ نہیں ہیں بلکہ پاکستان کے دشمن اور غدار بھی ہیں۔ بجلی کے جو مہنگے اور فضول معاہدے ان دونوں نے کیے ہیں اگر انگریز ہوتے وہ بھی نہ کرتے۔
 

AbbuJee

Chief Minister (5k+ posts)
The main difference is that this dam will be constructed with minimum "family benefits programs" and that's what bothers PMLN goons ? All their hopes to get money laundered out of country went down the garage drain ?
 

Eyeaan

Chief Minister (5k+ posts)
پاکستان میں ایک مخصوص طبقے کو پاکستان میں ڈیم بنتا دیکھ کر جو تکلیف ہوتی ہے اندازہ نہیں ۔ اتنا ہی صدمہ انہیں کسی قسم کی اٹامک میدان میں پراگریس دیکھ کر ہوتا ہے ۔یہ طبقہ جو خاص نونی تو نہیں مگر آجکل نون لیگ کا ہمدرد اور مریم کا دست راست ضرور بنا ہے ۔ یہی مخصوص طبقہ ڈیم فنڈ پر طنز کرتا تھا اور جسٹس نثار پر بہتان لگاتا رہا ۔